Enius awarded contract for wind turbine management at Drents Overijsselse Delta Water Authority
This means our involvement does not end after commissioning. Instead, a new phase begins. A phase in which we ensure the energy system continues to perform optimally and the water authority achieves maximum returns from the sustainable energy it generates.
The turbine is an ENERCON E-138 EP3 E3, 4.5 MW. It is a new model within the EP3 series, equipped with the so-called e-nacelle. We look forward to supporting this turbine for many years to come.
What makes this project special?
What makes this project particularly special is its location on the site of a wastewater treatment plant. This requires careful coordination and strict safety procedures. These aspects received a great deal of attention during the construction phase and will remain important during the management phase.
At Enius, we believe good asset management goes beyond monitoring alone. Through continuous innovation, automation and 24/7 monitoring, we combine smart systems with personal involvement. Our clients always have a dedicated asset manager as their point of contact. For this project, that is Eric van Middendorp.
We look forward to the successful operation of this special turbine.
Enius. Energizing ambitions.